Installation and Setup
www.nvidia.com
NVIDIA RTX Blade Server
DU-09554-001 _v02 | 13
Make sure the clip returns to its original position after the screw is secured.
b) Install the pan or round head screws to the back of the rails in the position
indicated in the following diagram for left and right side rails.
6.
Confirm that the rails have been installed properly.
‣
Both sides are installed on the same rack unit and are horizontal to each other.
‣
The bottom lip is at the same height on all four posts.
‣
The metal clips are properly attached.
‣
Four screws are installed - flat head on the front and pan head on the back.
2.4.2. Installing the Rack Shelf
A heavy-duty shelf for 4-post racks may be provided instead of the rail kit.
Once installed, it does not allow the system to be moved. All components
are serviceable from the front or rear, so this movement is not necessary.
See
https://www.racksolutions.com/downloads/dl/file/id/672/product/1783/
heavy_duty_fixed_shelf_installation_instructions.pdf
for instructions on installing the
rack shelf.
Summary of Contents for RTX BLADE SERVER
Page 1: ...NVIDIA RTX BLADE SERVER DU 09554 001 _v02 September 2019 Installation Guide ...
Page 36: ...Compliance www nvidia com NVIDIA RTX Blade Server DU 09554 001 _v02 34 ...
Page 38: ...Compliance www nvidia com NVIDIA RTX Blade Server DU 09554 001 _v02 36 ...
Page 39: ...Compliance www nvidia com NVIDIA RTX Blade Server DU 09554 001 _v02 37 ...