8.4 Commissioning
Before commissioning, a single safety inspection must be done (use the "single safety
inspection" form).
If the lift set up is done by a specialist (factory trained assembler) then he can also do the
safety inspection. If the set up is done by the operating company then a specialist must be
tasked with the safety inspection.
The specialist confirms seamless operation of the lift on the set up protocol for single safety
inspection and releases the lift for use.
After commissioning please complete the assembly protocol and send to the
manufacturer immediately.
8.5 Changing the assembly location
To change the assembly location the pre-conditions must be met according to the assembly
guidelines. The location change is to be done according to the following sequence:
• Move the lift rails to about half height.
• Remove the lifting arm (remove the safety ring of the lifting arm pin, pull out the lifting arm
pin and remove the lifting arm).
• Disconnect electrical supply lines to the lift from mains power.
• Remove hydraulic lines above on the opposite side and seal them off with blind stoppers.
• Only loosen cross beams on one side and fold them under along with the hydraulic lines.
• Securely fix the beam to the columns.
• Suction off hydraulic oil.
• Loosen the anchor fastenings.
• Carefully transport the lift column using appropriate auxiliary means (e.g. crane, forklift, etc)
to the new assembly location.
• Assemble the lift according to the procedure during assembly and anchoring before first
commissioning.
Use new anchors. The old anchors are no longer fit for purpose.