Operating Manual and Inspection Book
POWER LIFT HL 2.30 NT / HL 2.35 NT / HL 2.40 NT
20100016 OPI
- 9 -
Version 1.1
2.3 Changes to the design / construction
Inspections by a technical expert are required before recommissioning
(Date, type of change, technical expert signature)
.....................................................................................................................................................
.....................................................................................................................................................
.....................................................................................................................................................
Name, address of technical expert
..........................................................
....................................................
Location, date
Technical expert signature
2.4 Changing the assembly location
Inspections by a technical expert are required before recommissioning (date, type of change,
specialist signature)
.....................................................................................................................................................
.....................................................................................................................................................
.....................................................................................................................................................
Name, address of technical expert
..........................................................
....................................................
Location, date
Technical expert signature
Summary of Contents for HL 2.30 NT
Page 2: ......
Page 94: ...Notes ...