background image

 Operating Instruction and Documentation

 

                                                                                                                  4.40 ND 

 

- 5 - 

After completely filling out this sheet including signatures, copy and return  the 
original to the manufacturer. The copy must remain in the manual. 

 

Otto Nußbaum GmbH & Co. KG 

Korker Straße 24 

D-77694 Kehl-Bodersweier

 

 

Record of installation

 

 

The automotive lift with the 

 

serial number:............................................ 

was installed on:............................................... 

 

at the firm:.................................................  

at:..................................................................... 

 

The initial safety check was carried out and the lift was started. 

The installation was carried out by the operating authority/competent (please delete as applicable). 

The initial safety check was carried out by a competent person before the initial operation. 

The operating authority confirms the correct installation of the automotive lift, the competent person 

confirms the correct initial operation. 

 

Used Dowels(*):________________________________(Type/Name)       
 
Minimum anchorage depth (*) kept: _________________mm 

 

 

 

F

 ok 

 
Starting torque (*) kept: __________________________NM  

 

 

 

F

 ok 

 

............................................ .....................................................  ............................................ 

date 

       name 

of 

the 

operating 

authority  

signature of the operating authority 

 

............................................ .....................................................  ............................................ 

date 

       name 

of 

the 

competent 

person   

signature of the competent person 

 

 

Your customer service:.....................................................................................................(stamp) 

 

(*) 

see supplement of the dowel manufacturers

   

 

 

 

 

 

 

Automotive Lift date: 11/2009 /  Manual date: 20.11.2009 

 

Summary of Contents for 4.40 ND

Page 1: ...Valid since SN 307260 Operating Instruction and Documentation Serial number Otto Nu baum GmbH Co KG Korker Stra e 24 D 77694 Kehl Bodersweier Tel 49 0 7853 8990 Fax 49 0 7853 8787 E mail info nussbaum...

Page 2: ...structions 12 5 1 Lifting the vehicle 12 5 2 Lowering the vehicle 13 5 3 Lowering into the ratchet strip 13 5 4 Adjusting the platform 13 6 Troubleshooting 14 6 1 Lowering onto an obstacle 15 6 2 Emer...

Page 3: ...d the lift Above all chapter 4 Safety Regulations is very important and must be closely adhered to In addition to the safety regulations stated in the operating instructions manual the appropriate saf...

Page 4: ...ustments maintenance and inspections are to be followed according to the time intervals specified Details regarding the exchange of parts and components as mentioned in the operating instructions are...

Page 5: ...nt please delete as applicable The initial safety check was carried out by a competent person before the initial operation The operating authority confirms the correct installation of the automotive l...

Page 6: ...persons below were introduced after the installation of the automotive lift The introduction was carried out by either the erector from the lift manufacturer or from a franchised dealer competent pers...

Page 7: ...of this document these specialised staff will be called Experts and Competent persons Experts are persons for example self employed engineers experts which have received instructions and have the app...

Page 8: ...lift or in vehicles that are on the lift is therefore not allowed The installation of the standard lift in hazardous or dangerous locations such as wash bays is dangerous and is therefore not allowed...

Page 9: ...Operating Instruction and Documentation 4 40 ND 9 2 5 Declaration of conformity...

Page 10: ...l Tank approx 10 Litre Hydraulic oil recommended 32 cst Sound level 75 dB A Connection by customer 3 N PE 400V 50 Hz fuse T16A time lag fuse observe your regulations of your country 3 2 Safety device...

Page 11: ...Operating Instruction and Documentation 4 40 ND 11 3 3 Data sheet...

Page 12: ...switch must be switched off and locked before work on the vehicle can commence This is a safety precaution to ensure that the lift does not move during work The main switch must be switched off and lo...

Page 13: ...erve the complete lowering process Drive the vehicle off the lift if it is in the lowest position 5 3 Lowering into the ratchet strip Do not push the button A Press the lever slowly downwards The lowe...

Page 14: ...e technical service See chapter 5 2 Phone the technical service Phone the technical service Problem Motor does not start Potential causes No power supply Main switch is not engaged The main switch is...

Page 15: ...emergency lowering may only be done by persons who are trained in using the lift It is possible to open the hydraulic valve manually to lower the lift into the lowest position In case the lift is lock...

Page 16: ...er area around the automotive lift and secure the lift against unintentional lowering Clean and check the stripper of the cylinder Clean the piston rod using compressed air and examine for damages Exa...

Page 17: ...bserve the RAL Number Check the zinc surface and repair it with a suitable tool Use abrasive paper grain 280 White rust can result from moisture laying in certain areas for long periods of time Poor a...

Page 18: ...ractice will aid the preservation of the lift No guarantees can be given when damage egg rust or fading colour is the direct result of poor maintenance and cleaning practice Regular cleaning of all ki...

Page 19: ...ith a suitable type of cloth and inject it with a wax spray or an oil spray 8 Security check The security check is necessary to guarantee the safety of the lift during use It has to be performed in th...

Page 20: ...g of the lift must be examined after International Electronical Commission IEC guidelines 60364 6 61 before first start up by operators Also an insulation resistance examination is recommended 9 2 Ere...

Page 21: ...floor tiles the dowels have to be chosen according to picture 8 Liebig anchor Tighten the dowels a little bit Fasten the ropes at the top of the column pic position of the ropes Check the position of...

Page 22: ...ation is to be changed the new place has to be prepared in according to the regulations of the first installation The change should be performed in accordance with the following points Remove the spri...

Page 23: ...son he or she is to perform the security check If the operator installs the lift by him or herself he or she must instruct a competent person to perform the security check The competent confirms the f...

Page 24: ...n anchorage depth mm b 70 Thickness of concrete mm c min 140 Diameter of bore mm d 15 Thickness of the lift pieces mm e 0 40 Number of dowels 16 Starting torque 40 minimum thickness of concrete by usi...

Page 25: ...th mm b 70 70 70 Thickness of concrete mm c min 140 min 140 min 140 Diameter of bore mm d 15 15 15 Thickness of the lift pieces mm e 40 65 65 100 100 140 Number of dowels 16 16 16 Starting torque Nm 4...

Page 26: ...de l al sage do 15 18 24 Bauteildicke thickness of the lift piece Epaisseur de la pi ce tfix 0 50 0 100 0 100 Anzugsdrehmoment Nm turn ng moment moment d une force MD 40 80 120 a 4 b 8 c 10 d 12 e 16...

Page 27: ...plan de fondation actuel Bohrerdurchmesser diameter of bore Diam tre de l al sage do 15 18 18 24 24 Bauteildicke thickness of the lift piece Epaisseur de la pi ce tfix 0 40 0 50 0 100 0 50 0 100 Anzug...

Page 28: ...le F F F Condition bolts and bearings F F F Construction deformation cracking F F F Function movable rail F F F Condition welding F F F Torque moment of screws and dowels F F F Condition hydraulic uni...

Page 29: ...gs F F F Construction deformation cracking F F F Function movable rail F F F Condition welding F F F Torque moment of screws and dowels F F F Condition hydraulic unit F F F Condition colour F F F Cond...

Page 30: ...gs F F F Construction deformation cracking F F F Function movable rail F F F Condition welding F F F Torque moment of screws and dowels F F F Condition hydraulic unit F F F Condition colour F F F Cond...

Page 31: ...gs F F F Construction deformation cracking F F F Function movable rail F F F Condition welding F F F Torque moment of screws and dowels F F F Condition hydraulic unit F F F Condition colour F F F Cond...

Page 32: ...gs F F F Construction deformation cracking F F F Function movable rail F F F Condition welding F F F Torque moment of screws and dowels F F F Condition hydraulic unit F F F Condition colour F F F Cond...

Page 33: ...gs F F F Construction deformation cracking F F F Function movable rail F F F Condition welding F F F Torque moment of screws and dowels F F F Condition hydraulic unit F F F Condition colour F F F Cond...

Page 34: ...gs F F F Construction deformation cracking F F F Function movable rail F F F Condition welding F F F Torque moment of screws and dowels F F F Condition hydraulic unit F F F Condition colour F F F Cond...

Page 35: ...gs F F F Construction deformation cracking F F F Function movable rail F F F Condition welding F F F Torque moment of screws and dowels F F F Condition hydraulic unit F F F Condition colour F F F Cond...

Page 36: ...F F Construction deformation cracking F F F Function movable rail F F F Condition welding F F F Torque moment of screws and dowels F F F Condition hydraulic unit F F F Condition colour F F F Condition...

Page 37: ...ts list 0 1 Oil tank 240SPL01121 0 2 Oil level gauge 980011 0 3 Hydraulic block 440HN02037 M sub oil motor 1 5 kW 991033 P gear pump 4 2 cm 980332 1BK7D6 7 F Oil filter 980012 DBVpressure relief valve...

Page 38: ...Operating Instruction and Documentation 4 40 ND 38 Electrical diagram drawing Standard Version...

Page 39: ...Operating Instruction and Documentation 4 40 ND 39...

Page 40: ...Operating Instruction and Documentation 4 40 ND 40 Since 11 2009 Motor 1 5 kW 991033...

Page 41: ...Operating Instruction and Documentation 4 40 ND 41...

Page 42: ...Operating Instruction and Documentation 4 40 ND 42...

Page 43: ...Operating Instruction and Documentation 4 40 ND 43 Electrical diagram drawing Version India...

Page 44: ...Operating Instruction and Documentation 4 40 ND 44...

Page 45: ...Operating Instruction and Documentation 4 40 ND 45...

Page 46: ...Operating Instruction and Documentation 4 40 ND 46...

Page 47: ...Operating Instruction and Documentation 4 40 ND 47...

Page 48: ...Operating Instruction and Documentation 4 40 ND 48 Spare Parts List...

Page 49: ...Operating Instruction and Documentation 4 40 ND 49 Since 11 09 1 5kW 991033...

Page 50: ...Operating Instruction and Documentation 4 40 ND 50...

Page 51: ...Operating Instruction and Documentation 4 40 ND 51...

Page 52: ...Operating Instruction and Documentation 4 40 ND 52...

Page 53: ...Operating Instruction and Documentation 4 40 ND 53...

Page 54: ...Operating Instruction and Documentation 4 40 ND 54 Haupt schalter 990403 Taster 990130...

Page 55: ...Operating Instruction and Documentation 4 40 ND 55...

Page 56: ...Operating Instruction and Documentation 4 40 ND 56...

Page 57: ...Operating Instruction and Documentation 4 40 ND 57...

Page 58: ...Operating Instruction and Documentation 4 40 ND 58...

Page 59: ...Operating Instruction and Documentation 4 40 ND 59...

Page 60: ...Operating Instruction and Documentation 4 40 ND 60...

Page 61: ...Operating Instruction and Documentation 4 40 ND 61...

Page 62: ...Operating Instruction and Documentation 4 40 ND 62...

Page 63: ...Operating Instruction and Documentation 4 40 ND 63...

Page 64: ...Operating Instruction and Documentation 4 40 ND 64...

Reviews: