Operating Instruction and Documentation
4.80 H SST- 4.300 H SST
- 27 -
• Disconnect the power supply and the plugs under the platforms.
• Refill the oil.
• Loose the dowels.
• Loose the crossbeam and remove it.
• Transport the lift to the new installation place.
• Install lift in accordance with chapter "Installation and Initiation" of the lift.
Use new dowels, the used dowels can not be used anymore.
A security check must be performed before preoperational by a competent person.
Use form “Regular security check”.
9.5 Initiation
Before the initiation a security check must be performed. Therefore use form: First
security check.
If the lift is installed by a competent person, he will perform this security check. If
the operator installs the lift by himself, he has to instruct a competent person to
perform the security check.
The competent confirms the faultless function of the lift in the installation record and
form for the security check and allows the lift to be used.
Please send the filled installation record to the manufacturer after the installation.
Summary of Contents for 4.120 H SST
Page 9: ...Operating Instruction and Documentation 4 80 H SST 4 300 H SST 9 2 5 CE Certificate ...
Page 10: ...Operating Instruction and Documentation 4 80 H SST 4 300 H SST 10 ...
Page 13: ...Operating Instruction and Documentation 4 80 H SST 4 300 H SST 13 3 3 Data sheet ...
Page 44: ...Operating Instruction and Documentation 4 80 H SST 4 300 H SST 44 Hydraulic diagram drawing ...