NuAire Sunwarm Air Installation And Maintenance Details Download Page 1

Sunwarm Air 

Solar Energy Ventilation System

Installation and Maintenance Details for:

The Roofing contractor

The Building contractor

The Electrician

1

10. 09. 13. Leaflet Number 671379 

Nuaire Limited

Western Industrial Estate  Caerphilly   United Kingdom  CF83 1NA  

T: 029 2088 5911   F: 029 2085 8444   E: [email protected]   W: www.nuaire.co.uk

The EMC Directive 
2004/108/EC  
The Low Voltage 
directive 
2006/95/EC

Summary of Contents for Sunwarm Air

Page 1: ...contractor The Building contractor The Electrician 1 10 09 13 Leaflet Number 671379 Nuaire Limited Western Industrial Estate Caerphilly United Kingdom CF83 1NA T 029 2088 5911 F 029 2085 8444 E info n...

Page 2: ...ing Section 3 0 Building contractor projects a Assemble and install a platform in the loft and mount the Sunwarm air unit b External hole forming on gable end if applicable and installation of an exte...

Page 3: ...ected by the occupants on the user control panel provided will be the delivered air temperature into the home 1 2 Handling The Solar Air Collectors and the Air Handling Unit are delivered to site in s...

Page 4: ...eived all items listed under the packing lists on this page 2 Make sure you have all the necessary health and safety equipment needed Installation and Maintenance Sunwarm Air Solar Energy Ventilation...

Page 5: ...ntrally within the dwelling 45o bend supplied Roof tile vent part no PVC4411 installed via a 180 x 150mm reducer on north or opposite side of roof pitch to collectors supplied Air from loft via 180mm...

Page 6: ...twork connections Each collector is essentially a weathered box that has to be secured and weathered to the roof structure Two penetrations are required into the loft space for ductwork connections at...

Page 7: ...tor base M8 nut and washer Secure with thread locking fluid End view of C Channel Note screw to underside of two rafters after M8 rods are fixed M8 threaded bar Note 30mm penetration into collector ba...

Page 8: ...ctural integrity of the roof structure Trim batten back to clear the edge of the solar panel by 25mm approx Roofing felt located between truss and batten is not shown Sectional view Supporting the spa...

Page 9: ...d extend beyond the sides of the solar panel by 200mm minimum Note Roofing felt between batten and truss is not shown Spaced to suit roof tile Roof tiles overlap thegutter lips of the solar panel by 4...

Page 10: ...comprises a flat box hood on a circular upstand a 500 x 500mm flashing skirt of non lead material and a stepped adaptor that allows connection to the 180mm dia ducting via a 150 x 180mm dia reducing p...

Page 11: ...final chosen postion so that ducting lengths and the hole which must be cut for the diffuser can be undertaken see section 3 3 and 3 5 The diffuser must be located correctly in the central hallway in...

Page 12: ...d when this method of installing the diffuser is used b Painted aluminium type c w intumescent fireblock Cut a 200mm hole in ceiling and align the top portion of unit A above the ceiling over the hole...

Page 13: ...joints and bends must be clamped with the supplied clamping collars every other metre or where a 30 or 90o bend is inserted 4 The ducting can be connected to the Sunwarm Air unit with an insert connec...

Page 14: ...self tapping screws supplied to connect each of the 4 solar collector spigots to inlet and outlet holes of the collectors ensuring that the spigot with a pre connected sensor is located in one of the...

Page 15: ...15 10 09 13 Leaflet Number 671379 Inlet sensor inserted in ducting near tile vent to measure outside air temperature The sensor cable should be strapped to the exterior of the ducting and plugged int...

Page 16: ...e following sequence amber red amber red all off Release the button when all the LEDs are turned off The red LED will flash to indicate the flowrate in tens followed by the amber LED which indicate fl...

Page 17: ...mm 313 313 180 198 1044 473 560 392 Figure 24 Diffuser 303 33 70 8 25 195 dia 303 Figure 23 Sunwarm Air Handling Unit Figure 26 User control View from back View from Top Figure 27 25mm Upstand Solar A...

Page 18: ...and turned off b Remove the 2 screws at the white handle of the unit using a 5mm Allen key c Gently prise away the 2 filters from each side of the fan housing d Replace with new filters ensuring the...

Page 19: ...of joining to duct work systems They must not be used to support the ductwork 4 4 In the event of RF interference the fan may change speed This is normal and will have no adverse effect on the fan The...

Page 20: ...intenance Sunwarm Air Solar Energy Ventilation System 20 10 09 13 Leaflet Number 671379 Western Industrial Estate Caerphilly United Kingdom CF83 1NA T 029 2085 8400 F 029 2085 8444 E info nuaire co uk...