
23
EN
DE FR ES IT PT
9. Periodical Maintenance Checks
Perform periodical maintenance checks every three months, referring to the check sheet below. If any abnormalities are found, contact your Authorized
NSK Dealer.
Points to check
Details
Head cap is loose
Check that the Head Cap is firmly tightened.
Rotation
Rotate the handpiece and check for abnormalities such as abnormal rotation, vibration, noise, and overheating.
Coolant Water
Operate the handpiece and check that the coolant water is flowing through all spray ports.
Summary of Contents for Ti-max Z45L
Page 1: ...002 ...
Page 7: ...6 3 Accessory List No Part Name Quantity 1 Wrench 1 2 E Type Spray Nozzle 1 ...
Page 33: ...32 3 Zubehörteile Liste No Bezeichnung der Teile Anzahl 1 Schlüssel 1 2 Sprühdüse Typ E 1 ...
Page 59: ...58 3 Liste des accessoires No Nom de la pièce Quantité 1 Clé 1 2 Embout de spray de type E 1 ...
Page 111: ...110 3 Lista degli accessori No Denominazione Quantità 1 Chiave 1 2 Beccuccio spray tipo E 1 ...
Page 158: ...2015 10 20 005 M ...