3. INSTALLATION
3.1
BASIC REQUIREMENTS
1.
Check that the mains voltage of your electrical installation
matches the value indicated on the equipment plate, the
electrical socket is capable to supply at least 14A and is
provided with an efficient earth connection. In case the in-
stallation makes inaccessible the power supply switch, pro-
vide for a proper electrical breaker.
The manufacturer will not be responsible
for damages to people or things caused
by an unsuitable electrical installation or
missing of the ground connection
.
2.
The equipment must be installed on a flat surface; adjust the
front feet to have a slight slope and so make the outflow of
water easier during the drain phase.
WARNING: do not place the unit on surfaces which
could cause fire or fume if hot items fall from the
equipment.
3. For the correct operation, it is mandatory to leave a free
space of at least 4 cm on the rear side of the equipment.
4. Do not install the equipment near heat sources, in humid or
not well aired environment; in a sterilization room is required
a minimum of 10 air changes per hour, a recirculating air
ventilation system (i.e. fan) can not be used in place of.
5. On the rear panel it is located the safety valve, if it operates
for overpressure, hot steam may be released: locate the
equipment in such a way to eliminate the risk of burning for
the operator (ex. near a wall).
If the sterilizer is installed in a cabinet, provide adequate space
(>10 cm) for aeration.
Missing cooling can cause failure or slow vacuum phases
4 cm