Instruction VCM-3 On-Site Commissioning
VCM-3 Homepage Commissioning
Procedure
EN
UNRESTRICTED DOCUMENT
2
Use the Oscilloscope function to check the sensor connections and that the sensor provides a valid
signal.
4.6
Configuration
IMPORTANT NOTE!
It is essential that this manual process is done correct, otherwise you may require an
extra visit to rectify the information.
Configure network and machine specification
Select the Commissioning-Configuration Page on the VCM-3 Homepage.
On the
Commissioning
– Configuration
page
– key in the network configuration
•
Name: Enter a machine name
•
Number: Enter a number of the machine
•
IP Address
•
Default Gateway
•
Netmask
Remember to click
Save Changes