NRG Instructions
SRA System | All-Weather PVH Kit
SRA_All-Weather_PVH_Kit_Instructions
Rev. 5.0
[email protected] | Page 15
18 April 2018
2.3 Attach Ventilator Control System (Shelter Box) to Tower.
Thread the provided band clamps through the outer slots of the brackets on the back of the shelter box.
Wrap the band clamps around the tower and secure with a 5/16” hex nut driver. An electric drill or
impactor with a 5/16” nut driver will speed up the tightening process.
Figures 2-18 & 2-19: Shelter box brackets and attachment to the tubular tower.