![NRG Systems 11174 Instructions Manual Download Page 6](http://html.mh-extra.com/html/nrg-systems/11174/11174_instructions-manual_1714010006.webp)
NRG INSTRUCTIONS
SRA System | Soiling Measurement Kit
SRA Soiling Measurement Kit Instructions
Rev. 6.0
[email protected] | Page 6
19 December 2018
1.2: Mount upper U-bolt to tower,
Mount upper U-bolt (Figure 1-2, right) and bracket near the top of the NRG SRA tower using the 3/4”
wrench (Figure 1-3). Make sure that the 7/16” bolt heads are facing down and the slide nuts are facing
upwards. Do not overtighten the U-bolt nuts.
Note: The lower U-bolt will be mounted to the tower approximately 15” below the upper U-bolt later.
Verify that there is space on the tower tube at this location for the lower U-bolt.
Figure 1-2: U-bolts and brackets, lower (left) & upper (right)
Figure 1-3: Mounting the upper U-bolt