Installation / Operation / Maintenance  

Staticmaster Linear Ionizer 

 Models P-2001 and P-2001-I, and 

Combination Bar Model P-2001/4275 

 

Please Observe the Following 

NOTICE:  

Please review the information in this manual prior to operating the Nuclestat®in a work 
environment. 

 

 

Please keep this document in a convenient place to refer to as a guide 

 

Description 

This  family  of  ionizers  neutralizes  the  high
static  charges  developed  in  materials  being
processed by providing ionized air to them. 
 

Installation & Operation 

1.

 

Remove  the  protective  cover  shield  by
sliding it off either end. 

 

2.

 

Determine  a  mounting  location  that  will
satisfy the following requirements: 

 

 

A)

 

The  ionizer  will  face  the  side  of  the
material that is statically charged. 

 

B)

 

The ionizer will be positioned after the
point  where  static  is  developed,  e.g.,
after the last static generating roller or
friction point. 

 

 

C)

 

The distance between the ionizer (i.e.,
Nuclestat

®

  grid  or  Induction  Bar

brushes  or  points)  and  the  charged
material  will  be 

pprox..  1-1/8”(3

cm). 

 

 

D)

 

No part of the ionizer will contact the
charged  material  during  normal
process operations. 

 
 

E)

 

If  the  Model  P-2001-I  is  to  be
installed,  the  processed  material  must
pass by the Induction Brushes without
contact.   

 

 

 

 

F)

 

If installing more than one ionizer for a
single application, the ionizers will not 
be  positioned  directly  opposite  each
other  on  both  sides  of  the  material
being processed. 

 

3.

 

Mount the ionizer to a rigid structure in the
selected  location.    Attachment  hardware
(two  #8-32  socket  head  cap  screws)  is
provided. 

 

4.

 

Ground  the  ionizer  by  attaching  the  eyelet 
at  the  free  end  of  the  grounding  strap  to
ground  potential.  (Attachment  hardware  is
not  provided).    Ensure  that  the  process
machinery  is  also  grounded.    Verify  that
the ionizer and machinery are grounded by
having  them  checked  by  a  qualified 
electrician. 

 

The ionizer is now ready for use.

 