
O p e r a t i o n a n d M a i n t e n a n c e
142
Sliding Rotator Wreckers – Operation and Maintenance
Models: CSR50 - CSR65 - CSR85
REV. 0
SEPTEMBER 19, 2022
1. Slowly place the boom in the centre of the underlift rails at the rear of the body until it
locks into place.
2. Verify that the boom is centred using the following steps:
a. Visually verify that the boom is centred. You can also place a straightedge on the
boom and measure each side.
b. On the touchscreen interface, verify that the indicator sensor shows that the boom
is centred. If the indicator sensor does not show that the boom is centred, adjust the
sensor's position so that it detects the boom.
c. After the indicator sensor is adjusted and is able to detect that the boom is centred,
visually verify again that the boom is centred.
3. If the boom is out of alignment, align it as follows.
Align the boom by adjusting the screws on the front locks
1. Loosen the locknuts securing the adjustment bolts.
2. Screw the bolts in or out. Tighten the locknuts.
4.4.7
Disassembling the outriggers
For the CSR50
Disassembly
1. Extend the outrigger and stop when the small section (#4) is extended approximately 10-
15 inches so you can access the steel shims (#14) of the middle section (#5).
2. Remove the steel shims (#14) and the bottom nylon pad (#6) of the middle section.
3. Support the small section with an appropriate tool.
Make sure to properly support the small section during disassembly. It is
heavy and may cause damage or injury if it is unsupported and falls to the
ground.