
O p e r a t i o n a n d M a i n t e n a n c e
136
Sliding Rotator Wreckers – Operation and Maintenance
Models: CSR50 - CSR65 - CSR85
REV. 0
SEPTEMBER 19, 2022
1. Loosen the jam nut.
FIGURE 53 — ADJUSTING THE COUNTERBALANCE VALVE (CBCG-LJN)
2. Turn the set screw clockwise until it stops.
3. Turn the set screw counter-clockwise to the appropriate setting (described above) and
keep the screw in this position while you tighten the jam nut.
NOTE: Position the Allen key so you can easily count how many turns you make
when setting the screw.
4.4.3
Adjusting the sequence valve (SCCA-LAN)
The wrecker has one sequence valve, which is located in the boom (shown below). This valve
ensures that the larger sections of the boom are extended before the smaller sections.