
06/16 Rev. 09
SERVICE MANUAL
Service Mechanics
DPM – PEM – ALX 92x
59
Print roller (PEM)
Tools
•
2 mm allen key
Dismantling
1. Remove the locking plate [91A]..
2. Loosen both set screws [114A] at the print
roller coupling.
3. Pull the print roller out of the coupling
[115A] and remove it from the bearing
plate [115B].
Assembly
To assemble the device, follow the steps in
the reverse order. Ensure that:
One of the set screws presses against
the flattening of the print roller axle.
[113] Locking plate (A) on the print roller (PEM LH).
A
[114] Set screws (A, 2x) at the print roller coupling.
A
[115] Removing the print roller.
A
B
Summary of Contents for ALX 92x
Page 3: ...Release 3 6 2016 SERVICE MANUAL ALX 92x Print Apply system ...
Page 356: ...12 14 Rev 05 SERVICE MANUAL Service Electronics 64 xx Gen 2 DPM Gen 2 ALX 92x Gen 2 43 ...
Page 508: ...Edition 1 3 2016 INSTALLATION MANUAL AI retrofitting kit for ALX 92x ...
Page 509: ......
Page 511: ...Installation Manual AI retrofitting kit for ALX 92x 03 2016 4 Content ...
Page 520: ...Installation Manual AI retrofitting kit for ALX 92x 03 2016 00 13 Installation ...
Page 521: ......
Page 522: ...Novexx Solutions GmbH Ohmstraße 3 85386 Eching Germany 49 8165 925 0 www novexx com ...