Solution Packs
349
no
vd
ocx
(e
n)
7 Ja
nua
ry 201
0
2
Select a Control.
3
Click the Implementation tab in the Documentation frame.
4
Follow all of the instructions in the Implementation tab.
5
Add notes to the Notes tab of the Documentation frame as necessary to document progress or
necessary deviations from the recommended implementation steps.
6
When the implementation is complete, select the Control and change the status drop-down to
Implemented.
7
An audit event is generated and sent to the Sentinel Control Center.
Because of potential legal and regulatory implications, the status for a Control should only be
changed after all of the implementation steps have been successfully completed.
NOTE:
A Control must be installed before it can be implemented.
15.3.5 Testing Controls
After the content implementation, the content should be tested to verify that it is working as
expected. Testing might require steps such as the following:
Run a report.
Generate a failed login in a critical server and verify that a correlated event is created and
assigned to an iTRAC workflow.
These steps should be added when the Solution Pack is created in Solution Designer.
To test a control:
1
Open a Solution Pack in Solution Manager.
2
Select a Control.
3
Click the Testing tab in the Documentation frame.
4
Follow all of the instructions in the Testing tab.
5
Add notes to the Notes tab of the Documentation frame as necessary to document progress or
necessary deviations from the recommended testing steps.
6
When the testing is complete, select the Control and change the status drop-down to Tested.
7
An audit event is generated and sent to the Sentinel Control Center.
Because of potential legal and regulatory implications, the status for a Control should only be
changed after all of the testing steps have been successfully completed.
NOTE:
A Control must be installed (and should be implemented) before it can be tested.
Summary of Contents for SENTINEL 6.1 SP2
Page 4: ...4 Sentinel 6 1 User Guide novdocx en 7 January 2010 ...
Page 20: ...20 Sentinel 6 1 User Guide novdocx en 7 January 2010 ...
Page 34: ...34 Sentinel 6 1 User Guide novdocx en 7 January 2010 ...
Page 116: ...116 Sentinel 6 1 User Guide novdocx en 7 January 2010 Integer Variable String Variable ...
Page 146: ...146 Sentinel 6 1 User Guide novdocx en 7 January 2010 ...
Page 172: ...172 Sentinel 6 1 User Guide novdocx en 7 January 2010 ...
Page 178: ...178 Sentinel 6 1 User Guide novdocx en 7 January 2010 ...
Page 280: ...280 Sentinel 6 1 User Guide novdocx en 7 January 2010 ...
Page 306: ...306 Sentinel 6 1 User Guide novdocx en 7 January 2010 ...
Page 329: ...Quick Start 329 novdocx en 7 January 2010 ...
Page 330: ...330 Sentinel 6 1 User Guide novdocx en 7 January 2010 ...
Page 412: ...412 Sentinel 6 1 User Guide novdocx en 7 January 2010 ...
Page 430: ...430 Sentinel 6 1 User Guide novdocx en 7 January 2010 ...
Page 440: ...440 Sentinel 6 1 User Guide novdocx en 7 January 2010 Figure 18 3 Reports ...
Page 528: ...528 Sentinel 6 1 User Guide novdocx en 7 January 2010 ...