5 - MAINTENANCE
5-15
WEEKLY
Re-Torque Wheel Flange Nuts
1. Unfold the machine into the
Field Position
Till Folding & Unfolding” on page 4-11)
2. Lower the disks to the ground by retracting the
Front
Wheel Cylinders
A
and
Rear Roller Cylinders B
.
A
B
Fig. # 5-1 Lower Disks to the Ground
3. Relieve all the hydraulic pressure by placing the tractor
SCV levers to the
FLOAT POSITION
with engine
running for the
Main Frame Lift
&
Wing Fold
cylinders.
4. The machine should now be in the
“Field Lowered Po-
sition”
5. Re-torque
Wheel Flange Nuts
A
at 10 hour intervals or
(daily). If bolt torque is stable, check at 50 hour intervals
or (weekly).
350 ft-lbs
475 N-m
10
50
1
2
3
4
5
6
7
8
9
10
Fig. # 5-2 Wheel Flange Nut Tightening Sequence
A
A
Fig. # 5-3 Wheel Flange Nut Locations 25’, 30’, 35’, 40’, &
45’
Summary of Contents for Kwik-Till HSD2500
Page 2: ......
Page 10: ...1 4 1 GENERAL INFORMATION This Page Is Intentionally Left Blank...
Page 91: ...4 WORKING OPERATIONS 4 25 Fig 4 69 3 Rear Roller Deflector Locations A A...
Page 92: ...4 WORKING OPERATIONS 4 26 This Page Is Intentionally Left Blank...
Page 134: ...5 MAINTENANCE 5 42 This Page Is Intentionally Left Blank...
Page 144: ...8 FORMS AND DECLARATIONS 8 2 This Page Is Intentionally Left Blank...
Page 152: ...i 6...
Page 153: ......