212
RLC Installation and Administration Guide
Configuring the RLC
Standard 4.0
If you test QoS transition by disconnecting the Ethernet cable from the Remote
Gateway 9100 Series unit, or RLC, expect up to a 20-second delay before the
Remote Gateway 9100 Series unit can place or receive a call. You do not
encounter this delay when the network degrades and calls switch to BRI as
designed.
If a QoS transition occurs while a Remote Gateway 9100 Series unit is sending
or receiving a fax, the packets lost prior to the transition can result in:
a fax that is not readable at the receiving end
error messages that appear on both the sending and receiving fax machines
If this occurs, send the fax again.
More information
Refer to the
Remote Gateway 9100 Series Network Engineering Guidelines
(NTP 555-8421-103) for detailed information describing QoS Transitioning
Technology. To locate this document, click on the
Technical Documentation
link at the following website:
www.nortel.com
Getting there
RLC
→
Configuration Manager
→
Remote Connection Configuration
→
Quality of Service
Quality of Service dialog box
Summary of Contents for RLC
Page 2: ......
Page 4: ......
Page 6: ...vi RLC Installation and Administration Guide Publication history Standard 4 0 ...
Page 16: ...xvi RLC Installation and Administration Guide Contents Standard 4 0 ...
Page 26: ...xxiv RLC Installation and Administration Guide About this document Standard 4 0 ...
Page 102: ...76 RLC Installation and Administration Guide Planning for RLC installation Standard 4 0 ...
Page 132: ...106 RLC Installation and Administration Guide Installing the RLC Standard 4 0 ...
Page 262: ...236 RLC Installation and Administration Guide Configuring the RLC Standard 4 0 ...
Page 376: ...350 RLC Installation and Administration Guide Planning forms Standard 4 0 ...
Page 402: ...376 RLC Installation and Administration Guide Sample configuration files Standard 4 0 ...
Page 448: ...422 RLC Installation and Administration Guide Fields Index Standard 4 0 ...
Page 465: ......