
430 Chapter 37 Hardware procedures
241-7401-240 5.2S1
Procedure job aid
Table 13
Equipment checklist for unpacking a cabinet
Equipment
Cabinet with pre-installed:
•
doors (2) and keys (2)
•
switch shelving (1 or 2)
•
function processors (1 to 15 for each switch)
•
blank processor cards (14 for each switch less the number
of processors)
•
cooling units and cables
•
cable management unit(s)
•
door alarm cables
Power supplies (up to 3 for each switch) and blank power
supplies if switch contains fewer than three power supplies
Control processors (1 or 2 for each switch)
Blank control processor card (if the switch contains only 1
control processor)
Function processor cables, as required
Termination panels, as required for function processors
Grounding cable for termination panels
Grounding strips for termination panels (1 for each panel)
Power cords (1 for each power supply)
Power cord selector guide
Antistatic wrist strap
Optional: anchoring kit
Optional: eyebolts (4)
Summary of Contents for Passport 7400
Page 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 7401 240 5 2S1 ...
Page 28: ...28 About this document 241 7401 240 5 2S1 ...
Page 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Page 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Page 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Page 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Page 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Page 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Page 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Page 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Page 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Page 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Page 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Page 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Page 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 437: ......