428 Chapter 37 Hardware procedures
241-7401-240 5.2S1
Unpacking a vertically-packaged cabinet
Unpack a cabinet in a dust-free area near the installation site.
Prerequisites
•
Unpacking a vertically packaged cabinet involves removing the
packaging and removing the cabinet from the pallet. If space is limited at
the unpacking area, remove the cabinet from the pallet first and transport
it on a dolly. For the dimensions and weights of Passport hardware, see
241-7401-200 Passport 7400 Hardware Description.
Procedure steps
1
Ensure that the cabinet is properly secured to the pallet.
2
Move the cabinet on the pallet to the dust-free unpacking area using a
self-standing wheeled apparatus (for example, a hand truck or fridge
cart). Use two or three helpers to move the equipment over cables or
doorway thresholds.
3
Verify that the cabinet will be placed off the pallet onto on a flat surface so
that it does not tip over after you stand it upright.
CAUTION
Avoid structural stress when maneuvering uncrated
cabinets and shelf assemblies
When handling and moving uncrated cabinets and shelf
assemblies, avoid strain, excessive shock, or vibrations,
which can damage or warp the equipment.
WARNING
Risk of personal injury
The sharp ends of the staples that hold the packaging
together and anchor the cabinet to the pallet can be
exposed as you unpack the cabinet.
Summary of Contents for Passport 7400
Page 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 7401 240 5 2S1 ...
Page 28: ...28 About this document 241 7401 240 5 2S1 ...
Page 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Page 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Page 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Page 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Page 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Page 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Page 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Page 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Page 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Page 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Page 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Page 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Page 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 437: ......