Chapter 37 Hardware procedures 313
Passport 7400 Hardware Installation, Maintenance, and Upgrade 5.2S1
Powering up a 3-slot Passport switch
Power up a 3-slot Passport switch after installing all processor cards.
Prerequisites
•
install cabinet or switch shelving (for rack-mounted installations)
•
install termination panels, if required
•
install power cables
Procedure steps
1
Connect and wear the antistatic wrist strap.
2
Make sure that the power switch is in the standby position. See the figure
“3-slot Passport power switch” (page 314).
3
Ensure that the CP in slot 0 and the FPs are engaged.
4
Turn on the circuit breakers for the outlets that supply power to your
switch.
5
Apply power by setting the power switch to the on position.
6
Verify that the cooling unit is operational and that the LED display on each
FP is appropriate. See “Processor card LED status display” (page 241)
7
Verify that the appropriate LEDs are illuminated on termination panels.
See “Termination panel LED status display” (page 314)
CAUTION
Risk of equipment damage
You can damage equipment if you power up a switch
before you have met the prerequisites listed in this
section.
Summary of Contents for Passport 7400
Page 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 7401 240 5 2S1 ...
Page 28: ...28 About this document 241 7401 240 5 2S1 ...
Page 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Page 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Page 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Page 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Page 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Page 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Page 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Page 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Page 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Page 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Page 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Page 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Page 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 437: ......