Chapter 37 Hardware procedures 275
Passport 7400 Hardware Installation, Maintenance, and Upgrade 5.2S1
Installing dc power cables on a multiport aggregate device
Install dc power cables on a multiport aggregate device after you have
mounted the device to the rack or cabinet.
Procedure steps
1
Connect the dc power cable for each power supply to the output terminals
of the disconnect device.
2
Route the dc power cables into the cabinet or rack through the knockout.
3
Attach the terminal connector to the ends of the wires. Each cable
contains three wires: a positive, a negative, and a ground. Each connector
has three openings: a positive, a negative and a ground. Insert each wire
into the opening that it matches and secure it in place by tightening the
screw on the top of the connector. See the figure “Connecting power wires
to the terminal connector” (page 276).
4
Connect the terminal connectors to the terminal block for one of the power
supplies (on the rear of the unit); connect the second cable to the other
terminal block. Push the connector into the terminal block until it clicks
and feels secure. See the figure “Connecting the terminal connector”
(page 277).
5
Connect the power cables from the disconnect device to the power
source.
Summary of Contents for Passport 7400
Page 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 7401 240 5 2S1 ...
Page 28: ...28 About this document 241 7401 240 5 2S1 ...
Page 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Page 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Page 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Page 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Page 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Page 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Page 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Page 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Page 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Page 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Page 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Page 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Page 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 437: ......