
24
About this document
241-7401-240 5.2S1
•
have one or two years experience installing data communications
equipment. You must be familiar with general cabinet, shelf and
processor card installation techniques and terminology
•
be aware of all pertinent electrical and physical safety procedures and
standards.
How this document is organized
The 241-7401-240 Passport 7400 Hardware Installation, Maintenance and
Upgrade document contains common hardware tasks. Each chapter in this
document represents an individual task. Each task is made up of a
combination of particular procedures. Flowchart figures provide a visual
guide to help you navigate through a task by showing the order of all required
procedures. Immediately following each task flow figure is a bulleted list of
links to all of the procedures mentioned in the task flow.
Some of the procedures required by a task may be located in another NTP, for
example software configuration procedures will be found in 241-5701-600
Passport 7400, 15000, 20000 Configuration Guide.
The intention is that you will start by reading the high-level task and then
navigate to the required procedures. See “Sample task flow” (page 25).
WARNING
Risk of radio interference
Passport 7400 is a class A product. In a domestic
environment this product may cause radio interference,
in which case the user may be required to take adequate
measures.
Summary of Contents for Passport 7400
Page 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 7401 240 5 2S1 ...
Page 28: ...28 About this document 241 7401 240 5 2S1 ...
Page 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Page 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Page 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Page 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Page 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Page 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Page 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Page 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Page 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Page 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Page 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Page 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Page 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 437: ......