220 Chapter 37 Hardware procedures
241-7401-240 5.2S1
Installing a 16-slot Passport switch cooling unit
Install a 16-slot Passport switch cooling unit no more than ten minutes after
removing a cooling unit.
Prerequisites
•
You will need a cooling unit with PEC NTBP07AA.
Procedure steps
1
Use the faceplate handle to carefully lift the cooling unit with one hand.
2
Push on the bottom of the cooling unit with your other hand to rotate it to
a horizontal position.
Support the weight of the cooling unit with one hand and grasp the
faceplate handle with the other hand. See the figure “Installing a cooling
unit” (page 221).
3
Insert the cooling unit into the cooling unit chassis at a 45-degree angle.
Do not force it. Then, tilt the front of the unit down to an horizontal position.
4
Press on the cooling unit faceplate until it is inserted more than halfway
into its slot. Release the handle. Then, press on the faceplate until you
feel the connectors at the rear of the cooling unit engage. The faceplate
handle snaps up into a vertical position when the cooling unit is fully
engaged.
5
Lock the cooling unit. Use a 1/4-in. slot-head screwdriver to turn the
handle locking screw 1/4 turn clockwise. See the figure “16-slot Passport
switch cooling unit lock” (page 351).
Summary of Contents for Passport 7400
Page 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 7401 240 5 2S1 ...
Page 28: ...28 About this document 241 7401 240 5 2S1 ...
Page 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Page 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Page 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Page 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Page 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Page 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Page 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Page 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Page 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Page 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Page 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Page 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Page 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 437: ......