Chapter 17 Hardware procedures 643
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
Placing the NEBS 2000 frame onto the footprint
Place the NEBS 2000 frame onto the footprint to install the frame above the
isolator pad before leveling.
Prerequisites
•
You must be familiar with “Safety considerations and best practices”
(page 53).
•
You need a frame with PEC NTRU04. Other names for the frame include
PTE 2000 and NEBS 2000 frame.
•
The location of the NEBS 2000 frame footprint must already have been
prepared and marked on the floor according to the criteria in
241-1501-205 Passport 15000, 20000 Site Requirements and
Preparation Guide.
WARNING
Risk of injury when handling a frame
Never place a foot or a hand under any part of the frame
while it is being tilted or moved. Always move it with
three or four people. The weight of a shipped frame with
one Passport 15000 or 20000 is approximately 419 kg
(926 lbs); with two switches the weight is approximately
612 kg (1,344 lbs). For additional protection, wear safety
boots with steel toes.
WARNUNG
Verletzungsgefahr beim Gestelltransport
Stellen Sie niemals einen Fuß unter das Gestell, wenn
dieses bewegt oder gekippt wird, und greifen Sie nicht
unter das Gestell. Die Einheit muß mit vier Personen von
der Transportpalette genommen werden. Ein Gestell wiegt
mit einem Passport 15000 or 20000 ca. 420 kg, mit zwei
Passport-Einheiten ca. 610 kg. Tragen Sie zu Ihrem
zusätzlichen Schutz Sicherheitsschuhe mit Stahlkappen.
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......