
About this document 43
Passport 15000, 20000 Hardware Installation, Maintenance, and Upgrade 5.2S2
— “Removing a temperature sensor from a lower cooling unit”
— “Removing an upper cooling unit” (page 762)
— “Replacing a cooling unit alarm cable” (page 787)
— “Replacing a cooling unit power cable” (page 789)
Enclosing a NEBS 2000 frame with doors and side panels
A NEBS 2000 frame can be enclosed by adding doors to the front and rear of
the frame using the hardware kit NTQS37AA or NTQS37AB and by adding
the side panels and hardware from the kit NTPX4050. These changes are
made to this document:
•
added “Accessing equipment inside a NEBS 2000 frame with a door”
(page 63) to “Safety considerations and best practices” (page 53)
•
added the chapter “NEBS 2000 frame accessories” (page 115) to add
these task flows:
— “Door installation onto a NEBS 2000 frame” (page 117)
— “Door hardware removal from a NEBS 2000 frame” (page 125)
— “Illuminated brandline cover installation” (page 131)
— “NEBS 2000 frame enclosure installation” (page 134)
— “Side panel installation onto a NEBS 2000 frame” (page 135)
•
the other task flows that are affected by the presence or the addition of a
door kit or an extended side panel kit include:
— “Installation of a second switch into a NEBS 2000 frame”
— “NEBS 2000 frame installation” (page 161)
— “Parts installation in a Passport 15000 in a NEBS 2000 frame”
— “Parts installation in a Passport 20000 in a NEBS 2000 frame”
— “Passport 15000 or 20000 switch installation into an EIA rack”
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......