
162 Chapter 11 Initial switch hardware installations
241-1501-240 5.2S2
— how to mark the footprint on the floor
— power-and-ground requirements, and routing power-and-ground
cables to the Passport
— whether the enlarged frame footprint from adding doors to the frame
can be accommodated by the intended anchor position
•
Ensure that there is enough space to add on all optional frame hardware
accessories as indicated by the task flows in “NEBS 2000 frame
accessories” (page 115). Adding the frame accessories can be done prior
to anchoring the frame or after anchoring the frame, whichever is easiest
when placing the frame beside other equipment.
NEBS 2000 frame installation task flow
This task flow shows the sequence of procedures you do to install a NEBS
2000 frame. To link to any procedure, go to “Task flow navigation”
(page 164).
Summary of Contents for Passport 15000
Page 1: ...Passport 15000 20000 Hardware Installation Maintenance and Upgrade 241 1501 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 1501 240 5 2S2 ...
Page 32: ...32 Contents 241 1501 240 5 2S2 ...
Page 48: ...48 About this document 241 1501 240 5 2S2 ...
Page 52: ...52 Chapter 1 Overview of hardware tasks 241 1501 240 5 2S2 ...
Page 70: ...70 Chapter 2 Safety considerations and best practices 241 1501 240 5 2S2 ...
Page 84: ...84 Chapter 4 Alarm BITS module 241 1501 240 5 2S2 ...
Page 94: ...94 Chapter 5 CP and FP cables 241 1501 240 5 2S2 ...
Page 178: ...178 Chapter 11 Initial switch hardware installations 241 1501 240 5 2S2 ...
Page 182: ...182 Chapter 12 MAC address module 241 1501 240 5 2S2 ...
Page 216: ...216 Chapter 14 Power and ground hardware of a Passport 15000 or 20000 241 1501 240 5 2S2 ...
Page 872: ...872 Chapter 17 Hardware procedures 241 1501 240 5 2S2 ...
Page 873: ......