Chapter 16 – Starting up and testing the system
553-3121-210
Standard 3.0
January 1999
Procedure 18
Loading system software from a Software Daughterboard
1
Connect the external power supply, if not already done.
Note: The commercial AC power outlet should be tested to make sure
the correct voltage is present before plugging in the power cord.
Plug the power cord from each cabinet into the power supply outlet.
2
Set the circuit breaker on the NTMW11 power supply in each
cabinet to ON.
Observe the LED on the faceplate of the NTMW01 SSC card. The LED
should light steadily for a moment, then flash three times as it performs
its self test.
3
Observe the TTY or terminal screen.
Note: The TTY must be connected to TTY port 0.
Once the system is loaded, a menu driven program called the
“Software Installation Program” is automatically invoked. This program
is used to install the system software as described in
.
—————————— End of Procedure ——————————
Summary of Contents for Meridian Meridian 1
Page 3: ...553 3121 210 Standard 3 0 January 1999 ...
Page 17: ...xiv Contents 553 3121 210 Standard 3 0 January 1999 ...
Page 97: ...Page 78 of 536 Chapter 8 Installing a new system 553 3121 210 Standard 3 0 January 1999 ...
Page 107: ...Page 88 of 536 Chapter 10 Installing the system ground 553 3121 210 Standard 3 0 January 1999 ...
Page 113: ...Page 94 of 536 Chapter 11 Installing the power supply 553 3121 210 Standard 3 0 January 1999 ...
Page 125: ...Page 106 of 536 Chapter 12 Adding an expansion cabinet 553 3121 210 Standard 3 0 January 1999 ...
Page 209: ...Page 190 of 536 Chapter 18 Connecting the trunks 553 3121 210 Standard 3 0 January 1999 ...
Page 323: ...Page 304 of 536 Chapter 21 Installing Hospitality 553 3121 210 Standard 3 0 January 1999 ...
Page 419: ...Page 400 of 536 Chapter 23 Pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Page 555: ...Page 536 of 536 Chapter 25 Fault locating and clearing 553 3121 210 Standard 3 0 January 1999 ...