Option 11C Compact
Planning, Installation, Fault Clearing and CCBR Guide
88
Chapter 10 – Installing the system ground
General information
of this chapter describes how to install and connect
the ground source to the Meridian 1 Option 11C Compact cabinets. Refer to
“Grounding requirements” on page 22
for detailed information about
grounding requirements.
Note: The information contained in this Chapter applies to both the
Option 11C Compact and Compact Hospitality unless stated otherwise.
WARNING
Proper grounding is extremely important.
Failure to complete the following steps could result in a system that is:
• unsafe for personnel using the equipment
• not protected from lighting or power surges
• subject to service interruptions.
Insulated ground wire must be used for system grounding.
Summary of Contents for Meridian Meridian 1
Page 3: ...553 3121 210 Standard 3 0 January 1999 ...
Page 17: ...xiv Contents 553 3121 210 Standard 3 0 January 1999 ...
Page 97: ...Page 78 of 536 Chapter 8 Installing a new system 553 3121 210 Standard 3 0 January 1999 ...
Page 107: ...Page 88 of 536 Chapter 10 Installing the system ground 553 3121 210 Standard 3 0 January 1999 ...
Page 113: ...Page 94 of 536 Chapter 11 Installing the power supply 553 3121 210 Standard 3 0 January 1999 ...
Page 125: ...Page 106 of 536 Chapter 12 Adding an expansion cabinet 553 3121 210 Standard 3 0 January 1999 ...
Page 209: ...Page 190 of 536 Chapter 18 Connecting the trunks 553 3121 210 Standard 3 0 January 1999 ...
Page 323: ...Page 304 of 536 Chapter 21 Installing Hospitality 553 3121 210 Standard 3 0 January 1999 ...
Page 419: ...Page 400 of 536 Chapter 23 Pre programmed data 553 3121 210 Standard 3 0 January 1999 ...
Page 555: ...Page 536 of 536 Chapter 25 Fault locating and clearing 553 3121 210 Standard 3 0 January 1999 ...