
CC MIS Maintenance Guide
B-21
System Log Messages
CC MIS
CC MIS
Release 5.2
Network disconnect request on <x25 port>
A near end disconnect request was made to the X.25 card and port identified by <x25 port>.
(Action Code: J)
Requesting initialization...
DMSLINK is requesting initialization data from the switch. (Action Code: J)
Requesting start of call data transfer...
DMSLINK is requesting the switch to begin sending call event data. (Action Code: J)
Reset confirmation on <x25 port>
The X.25 card has returned a confirmation of a reset issued by the near end. (Action Code: J)
Warning Messages
This section lists the warning messages that may be generated by the DMSLINK process. These messages usually
indicate an unusual condition that can be appropriately handled by the DMSLINK process, and which does not pre-
vent the DMSLINK process from continuing execution.
<ro type> is not a valid operation at this time
A Remote Operation (RO) of type <ro type> was received from the switch at a time that was not appropriate (e.g.
an initialization data RO was received when no dspRequestInit request has been issued). (Action Code: F, K, B)
ACD group <primary dn> associated with unknown subpool number nn
A switchSendAcdGroupData message was received from the switch that referenced a subpool for which CC MIS
has not received a switchSendSubPoolData message for. (Action Code: F, R)
ACD group configuration overflow error
The merging of newly received initialization data with configuration information obtained from a previous ini-
tialization sequence has resulted in too many ACD groups in the configuration. This indicates a software problem
in the CC MIS system. (Action Code: B)
ACD-DN configuration overflow error
The merging of newly received initialization data with configuration information obtained from a previous ini-
tialization sequence has resulted in too many ACD-DNs in the configuration. This indicates a software problem
in the CC MIS system. (Action Code: B)
Accept failed
A request to accept a new application connection to this DMSLINK process has failed.
(Action Code: B)
Already Logged on - Logging off
In attempting to logon to the switch, it was discovered that the switch believes the DSP is already logged on. The
DSP will now request a logoff and restart the logon sequence. (Action Code: L)
Summary of Contents for CC MIS
Page 4: ...iv Publication History CC MIS CC MIS 297 2671 545 Release 5 2 ...
Page 12: ...viii Contents CC MIS CC MIS 297 2671 545 Release 5 2 ...
Page 22: ...xviii Steps CC MIS CC MIS 297 2671 545 Release 5 2 ...
Page 28: ...intr 6 297 2671 545 CC MIS Release 5 2 ...
Page 38: ...1 10 297 2671 545 CC MIS Release 5 2 ...
Page 72: ...4 8 297 2671 545 CC MIS Release 5 2 ...
Page 102: ...6 18 297 2671 545 CC MIS Release 5 2 ...
Page 142: ...7 40 297 2671 545 CC MIS Release 5 2 ...
Page 168: ...8 26 297 2671 545 CC MIS Release 5 2 ...
Page 212: ...10 4 297 2671 545 CC MIS Release 5 2 ...
Page 224: ...12 4 297 2671 545 CC MIS Release 5 2 ...
Page 232: ...13 8 297 2671 545 CC MIS Release 5 2 ...
Page 236: ...14 4 297 2671 545 CC MIS Release 5 2 ...
Page 238: ......
Page 322: ...System Log Messages CC MIS CC MIS B 82 297 2671 545 Release 5 2 ...
Page 332: ...Installing the operating system CC MIS CC MIS C 10 297 2671 545 Release 5 2 ...
Page 340: ...Historical database CC MIS CC MIS D 8 297 2671 545 Release 5 2 ...
Page 363: ...CC MIS Maintenance Guide E 23 CC MIS CC MIS Release 5 2 ...
Page 364: ...E 24 297 2671 545 CC MIS Release 5 2 ...
Page 369: ...CC MIS Maintenance Guide IN 5 CC MIS CC MIS Release 5 2 ...
Page 370: ...CC MIS Maintenance Guide IN 6 CC MIS CC MIS Release 5 2 ...
Page 371: ...CC MIS Maintenance Guide IN 7 CC MIS CC MIS Release 5 2 ...
Page 372: ...IN 8 CC MIS CC MIS 297 2671 545 Release 5 2 ...
Page 373: ......