
December 2006
Connecting the server to power
1005r Server Hardware Installation
61
Locating the power supply modules
Introduction
Both AC power supply modules are installed prior to shipping.The
following diagram shows the location of the power supply modules in
the rear panel (D and E):
Figure 9: 1005r rear panel
About the power supply module
After you power up the server (later in this guide), the power supply
module LED indicates its status.
A green LED on each power supply module indicates that the modules
are working properly. If the LEDs are unlit or red, the module is failing
or has failed. A problem with a power supply module is also indicated if
the PWR or MJR LED on the front of the server turns red.
Rack power and grounding
To ensure a complete power and grounding installation:
Summary of Contents for CallPilot 1005r
Page 6: ...Standard 1 06 6 CallPilot ...
Page 8: ...8 CallPilot Publication history Standard 1 06 ...
Page 10: ...Task List Standard 1 06 10 CallPilot ...
Page 12: ...Contents Standard 1 06 12 CallPilot ...
Page 34: ...1005r server description Standard 1 06 34 CallPilot ...
Page 58: ...Installing the server and peripheral devices Standard 1 06 58 CallPilot ...
Page 72: ...Index Standard 1 06 72 CallPilot ...
Page 73: ......