
1005r server description
Standard 1.06
18
CallPilot
Figure 1: Front panel controls
Label
Control or feature
Label
Control or feature
A
Power switch
L
HDD1 activity
B
Reset switch
M
HDD0 activity
C
Critical alarm LED
N
DVD/CD/CDRW LED and
eject button
D
Major alarm LED
O
Front serial port
E
Minor Alarm LED
P
USB 2
F
Power Alarm LED
Q
Electrostatic Discharge
(ESD) connection
G
NMI switch (not used)
R
Hard drive 1 pull handle
H
ID switch
S
Hard drive 1 release lever
Summary of Contents for CallPilot 1005r
Page 6: ...Standard 1 06 6 CallPilot ...
Page 8: ...8 CallPilot Publication history Standard 1 06 ...
Page 10: ...Task List Standard 1 06 10 CallPilot ...
Page 12: ...Contents Standard 1 06 12 CallPilot ...
Page 34: ...1005r server description Standard 1 06 34 CallPilot ...
Page 58: ...Installing the server and peripheral devices Standard 1 06 58 CallPilot ...
Page 72: ...Index Standard 1 06 72 CallPilot ...
Page 73: ......