46
MBM installation
Nortel Business Communications Manager 450 1.0
Installation — System
NN40160-301 01.04 Standard
July 2009
Copyright © 2006-2009 Nortel Networks
Configuring the GASM DIP switches
Use the procedure to configure the DIP switches before you install the GASM
into the main unit.
Prerequisites
•
For information about the GASM DIP switch settings, see
switch configuration (page 107)
.
Procedure steps
Step
Action
1
Locate the Module Select and Mode/Country Select DIP switches at the rear
of the GASM.
2
Configure the Module Select DIP switches (on the left side at the rear of the
module) to on (up).
3
Configure the Mode Select DIP switches (switches 1 to 3, on the right side
at the rear of the module) according to the requirements for your BCM450
system.
4
Configure the Country Select DIP switches (switches 4 to 8, on the right side
at the rear of the module) according to the regional requirements for your
BCM450 system.
--End--
Configuring the GATM DIP switches
Before you install the GATM into the main unit, configure the DIP switches to
the default factory positions. Make the required modifications by using the
software.
Procedure steps
Step
Action
Mode/Country Select
1 2 3 4 5 6
Rear of MBM
OFF
ON
Module Select
OFF
ON
1 2 3 4 5
Summary of Contents for BayStack 450 Switch
Page 141: ......