Installation sequence
Introduction
The diagram on the following page illustrates the installation
sequence for a typical Symposium Call Center Server
installation.
Assumptions
In order to perform the installation, this guide assumes the
following:
•
The Meridian 1 switch is correctly installed, operational,
and configured for use with Nortel Symposium Call Center
Server. Refer to the Nortel Symposium Call Center Server
and M1 Guide.
•
Meridian Mail, if it is used, is correctly installed,
operational, and configured for use with Nortel Symposium
Call Center Server.
•
All customer-supplied client PCs are operational and
running Windows 95, with the Service Pack supplied by
Microsoft, or have Windows 95 OSR2 installed.
•
The client network is installed and operational.