background image

Ultimate Carport 3.8m

BCCG / BCCG

Assembly Instructions

IMPORTANT

 Please read these instructions thoroughly before starting assembly.

Check all parts are present before assembly, call 020 3011 2040 for replacement parts.

These instructions should be kept in a safe place for future use.

Summary of Contents for BCCPSW3820+G

Page 1: ...Assembly Instructions IMPORTANT Please read these instructions thoroughly before starting assembly Check all parts are present before assembly call 020 3011 2040 for replacement parts These instructio...

Page 2: ...e all of the parts listed before starting the assembly If there are any damaged or missing parts please call us on 020 3011 2040 We will express any missing parts to you as soon as possible Keep these...

Page 3: ...ssembly area Keep the area around your work place area clean and tidy Take care when handling sharp tools and never carry sharp tools in your pocket Never leave your product unattended or partially bu...

Page 4: ...4 Canopy Parts List 3x LEG PST1 2 0m model PST3 2 5m model Framework 2x RL16 1x RL17 2x RL17A 2x RL19 1x RL20 3x BM1 1x GUT130W 1x GUT1575W 1x GUT2000W 2x DP85W 1x DP1580W DP2080W 3x XL71...

Page 5: ...5 Contact Support on 020 3011 2040 Norfolk Greenhouses Roof Sheets SR6 1140mm x 1830mm 4x 4x SR7 1140mm x 940mm...

Page 6: ...6 Canopy Parts List Hardware WROS1 WRUS1 WRES1 WRKS1 WKFB3 1x 3x 2x 1x 1x WKFB2 2x WOGC3 2x HBD 7x HBDT 4x HBP 2x NYLOC 70x STUD30 35x...

Page 7: ...7 Contact Support on 020 3011 2040 Norfolk Greenhouses Hardware ST4X34 ST8X5 SC6X32 MM7X60 CP6 47x 30x 78x 6x 3x 1x 8 5mm Drill Bit CBM6X80 6x...

Page 8: ...IN 2830 2330 OPTIMUM 2905 2405 MAX Unless otherwise stated all dimensions in mm i Offer both RL17A to the wall and measure from ground to underside of beam Align horizontally using a spirit level and...

Page 9: ...9 Contact Support on 020 3011 2040 Norfolk Greenhouses Step 3 Add CP6 to the LEG then fix BM1 between the Leg and RL17A Step 4 Repeat previous step for second Leg then fix RL17 between both uprights...

Page 10: ...10 Canopy Step 6 Attach 2x RL16 Step 5 Fix HBD and HBDT brackets to BM1 beams as configured below Frame Assembly...

Page 11: ...act Support on 020 3011 2040 Norfolk Greenhouses Step 8 Fix RL20 between both uprights Step 7 Assemble LEG and BM1 as shown fix to RL17A For 3 8m Carport use RL20 For 3 8m Carport with Extension Kit u...

Page 12: ...12 Canopy Step 10 Attach 2x RL19 Step9 Fix HBD brackets to BM1 as shown Frame Assembly...

Page 13: ...rfolk Greenhouses Step 11 Fix XL71 to underside of each BM1 Push fit HBP to exposed ends of the front beam If building a Carport with Extension from this point on refer to Carport Extension manual sup...

Page 14: ...he front left corner of the roof position so that there is a 50mm overhang from front beam see image right Apply fixings 1 to 4 into front beam RL17 every 3rd corrugation see image below Move the stru...

Page 15: ...ix exposed edge of last SR6 sheet to BM1 Step 13 Fix remaining 3x SR6 sheets i Overlay remaining SR6 sheets by 3 corrugations then fix with 8x SC6X32 every 3rd corrugation as shown i Fix using 4x SC6X...

Page 16: ...SR7 sheets Step 15 Position SR7 on top of first SR6 tight against the wall and fix Roof Assembly i Fix using 9x SC6X32 on exposed edge and every 3rd corrugation as shown i Fix each sheet using 8x SC6...

Page 17: ...17 Contact Support on 020 3011 2040 Norfolk Greenhouses Step 17 Fix exposed edge of last SR7 sheet to BM1 i Fix using 3x SC6X32 as shown...

Page 18: ...18 Canopy Step 18 Assemble gutter and fix to front beam of carport Gutter Assembly...

Page 19: ...Norfolk Greenhouses Step 20 Anchor feet to the ground Step 19 Assemble and fix downpipe to LEG i Use spirit level to align legs in the upright position Fix to the ground through holes in steel foot us...

Page 20: ...Canopy Norfolk Greenhouses 1 Vincent Avenue Crownhill Industry Milton Keynes MK8 0AB Tel 020 3011 2040 E mail info norfolk greenhouses co uk...

Reviews: