INSTALLATION/PERFORMANCE CHECK LIST
REFRIGERATION SYSTEM:
Was unit given 24 hr warm up period
for crankcase heaters?
YES
NO
Stage-1 Liquid Pressure (high side) ________________________
Stage-1 Suction Pressure (low side) ________________________
Has the owner’s information been
reviewed with the customer?
YES
NO
Has the Literature Package been left
with the unit?
YES
NO
INSTALLATION ADDRESS:
CITY ________________________
STATE ________________
UNIT MODEL # ________________________________________
UNIT SERIAL # _______________________________________
Unit Installed Minimum clearances per
Figure 2 (page 7)?
YES
NO
INSTALLER NAME:
CITY _______________________
STATE ________________
ELECTRICAL SYSTEM:
Electrical connections tight?
YES
NO
Line voltage polarity correct?
YES
NO
Rated Voltage: ___________________________________ VOLTS
L1-L2 Volts: _____________________________________ VOLTS
L1-L3 Volts: _____________________________________ VOLTS
L2-L3 Volts: _____________________________________ VOLTS
Avg. Volts: ______________________________________ VOLTS
Max. deviation of voltage
from avg. volts: ___________________________________ VOLTS
% Volt imbalance: ________________________________ VOLTS
Blower Motor HP: ________ Sheave Setting ___________# Turns
Has the thermostat been calibrated?
YES
NO
Is the thermostat level?
YES
NO
Is the heat anticipator setting correct?
(If Applicable)
YES
NO