
2
SAFETY INFORMATION .............................................3
REQUIREMENTS AND CODES ..................................3
GENERAL INSTRUCTIONS ........................................4
Combustion Air Quality ............................................4
Clearances to Combustible Materials ......................4
Installation in a Garage ............................................4
Heating
Load
...........................................................4
COMBUSTION AIR REQUIREMENTS ........................4
General
Information
.................................................4
Conventional Furnaces - Confi ned Spaces .............6
Air From Inside ....................................................6
Outdoor Air from a Crawl Space or
Vented
Attic
.........................................................6
Outdoor Air Using Vertical Ducts ........................6
Outdoor Air Using Horizontal Ducts ....................7
Air Directly Through an Exterior Wall .................7
Conventional Furnaces - Unconfi ned Spaces .........7
Direct
Vent
Furnaces
...............................................8
VENTING REQUIREMENTS ........................................8
Vent Pipe Material ...................................................8
Vent Pipe Length and Diameter ...............................8
Vent Pipe Installation ...............................................8
Outdoor Terminations - Horizontal Venting ..............9
Outdoor Terminations - Vertical Venting ................. 10
Vent Freezing Protection ....................................... 10
Condensate
Disposal
............................................ 10
Existing
Installations
.............................................. 10
CIRCULATING AIR REQUIREMENTS ......................11
Plenums and Air Ducts ..........................................11
Supply Air Connections ........................................11
Return Air Connections ........................................11
Side Return Installations ..............................11
Bottom Return Installations ..........................11
FURNACE INSTALLATION .......................................12
General
Requirements
..........................................12
Direct Vent (2 - Pipe) Applications ........................12
Upfl
ow
Installation
.................................................12
Side Return Air Inlet ........................................12
Bottom Return Air Inlet ....................................12
Horizontal
Installation
...........................................12
Bottom Panel Removal .........................................13
Alternate Bottom Panel Removal .....................13
Inducer Assembly Rotation ...................................13
Vent and Inducer Assembly Options .....................14
Accessories
...........................................................14
Finish
Flange
.....................................................14
Rubber
Grommets
.............................................14
PVC Tee, Reducer, & Hose Barbs ......................15
Condensate Drain Lines ....................................15
Optional
PVC pipe Installation ............................16
GAS SUPPLY AND PIPING .......................................16
Leak
Check
.........................................................16
High-Altitude
Application
......................................17
Conversion to LP/Propane ...................................18
ELECTRICAL WIRING ...............................................18
Low
Voltage
Wiring
..............................................18
Line
Voltage
Wiring
..............................................18
Twinning
...............................................................19
Grounding
............................................................20
START-UP & ADJUSTMENTS ...................................20
Pre-Start
Checklist
.................................................20
Start-Up
Procedures
..............................................20
Verifying and Adjusting Input Rate .........................20
Verifying and Adjusting Temperature Rise .............21
Verifying Burner Operation ....................................21
Verifying Operation of the supply Air Limit
Switch
....................................................................21
OPERATING SEQUENCE .........................................22
Heating
Cycle
........................................................22
Cooling
Cycle
.........................................................22
Fan
Mode
...............................................................22
MAINTENANCE .........................................................22
Air Filters ................................................................22
Cleaning of Burners ...............................................22
Blower
Compartment
.............................................23
Heat Exchanger and Burner Maintenance .............23
Lubrication .............................................................23
Vent
System
...........................................................23
DESCRIPTION OF COMPONENTS ..........................23
TROUBLESHOOTING ...............................................24
TABLE OF CONTENTS