Repair
6-12
Part 104373
−
03
E
2015 Nordson Corporation
É
É
É
É
É
É
É
É
É
É
É
É
É
É
É
É
É
É
ÇÇÇÇÇÇÇÇ
ÇÇÇÇÇÇÇÇ
ÇÇÇÇÇÇÇÇ
ÇÇÇÇÇÇÇÇ
ÇÇÇ
ÇÇÇ
ÇÇÇ
ÇÇÇ
ÇÇ
ÇÇ
ÇÇ
ÇÇ
ÇÇÇÇÇÇÇÇ
ÇÇÇÇÇÇÇÇ
ÇÇÇÇÇÇÇÇ
ÇÇÇÇÇÇÇÇ
ÌÌÌÌÌÌÌÌ
ÌÌÌÌÌÌÌÌ
ÌÌÌÌÌÌÌÌ
ÌÌÌÌÌÌÌÌ
ÌÌÌÌÌÌÌ
ÌÌÌÌÌÌÌ
ÌÌÌÌÌÌÌ
ÌÌÌÌÌÌÌ
ÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏ
ÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏ
ÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏ
ÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏ
1
2
3
4
5
6
7
8
9
Figure 6-10 Air Motor Rebuild
1. Square O-rings
2. Spring(s)
3. Cylinders
4. Piston/shaft assemblies
5. Lower head
6. Backup rings
7. U-cups
8. Upper head
9. Screws and washers
Air Motor Assembly
1. Wipe all parts clean with a lint-free, dry cloth.
2. See Figure 6-10. Lubricate new square O-rings (1) and install them in
the upper head (8).
3. Lubricate new U-cups (7) and backup rings (6) with Vitalizer oil and
install them on the pistons.
4. Install the springs (2) and piston/shaft assemblies (4) in the lower head
(5).
5. Lubricate the entire inside of the cylinder, and the top edges, with
Vitalizer oil.
6. Place the lower head/piston assembly on blocks. The blocks must hold
the lower head high enough so that the end of the piston shaft does not
touch the top of the workbench.