RM-384
System Module and User Interface
Page 5-20 Company Confidential Issue1
Copyright © 2009 Nokia. All rights reserved.
charging is required. If a valid supply voltage is applied while the PMIC is on, the power-on sequence is skipped.
A charging sequence will then be initiated.
Power off
While the PS_HOLD signal from the MSM is high, and the PMIC is in one of its power-on states. Under this
condition, the PMIC continually monitors three events that could trigger a power-off sequence:
The MSM drives the PS_HOLD signal low responding to the pressing of the keypad power button
Battery voltage drops below power off threshold (Battery voltage < 3.2 V)
The PMIC die temperature exceeds its “severe” over-temperature threshold