Shredders
6. - Putting into service
35
TBE GBseries 102
JN070AGB B
6. Putting into service
6.1
Coupling and uncoupling
6.1.1 Description of coupling elements
- A PTO shaft 1 3/8’’ - 6 splines.
- A 3-point hitch.
- 2 hydraulic hoses that control the lateral offset
cylinder.
- 1 hydraulic hose that controls the cutting head
cylinder.
6.1.2 Preparing the tractor
The machine adapts to tractors fitted with a 3 point
linkage category 2.
The tractor nominal PTO speed must be 540 min
-1
.