114
Service Manual – SC500
24 - Electrical System
Battery installation
1 Remove the ingnition key, and disconnect the red battery connector
2 Lift the recovery tank cover and check that it is empty; if not, empty it using the drain hose
3 Grasp the handle and carefully lift the recovery tank
4 The machine is supplied with cables suitable to install 2 12V batteries
5 Carefully lift the batteries until the relevant compartment, then place them properly
6 Route and install the battery cable as shown in the diagram (Figure 6), then carefully tighten the nut on
each battery terminal
7 Place the protection cap on each terminal, then connect the red battery connector
8 Perform a complete battery charging cycle
12 V
12 V
Figure 6: