FORM NO. 71456A - UHB 51-1500 -
7
PREPARING THE MACHINE
FOR USE
(B)-INSTALLING THE BATTERIES
1
Carefully lift the batteries into the battery tray. Arrange as shown in
Figure
B.
B
2
Make sure the key switch is in the OFF position.
3
Install the battery cables as shown in
fi
gure B, with the terminals marked
“P” on the positive battery posts and the terminals marked “N” on the
negative battery posts. Position the cables so that the caps can be
easily removed when it is necessary to add water to the batteries.
4
Tighten the nut on each battery terminal just enough to keep the terminal
from being turned on the battery post. Then tighten the nut one more
full turn.
5
Coat all the terminals and posts with grease, petroleum jelly or spray-on
battery coating (available at most auto parts stores).
6
Put on the black rubber “boots” over each of the terminals and use the
plastic tie straps to hold them in place.
7
Join the connector from the battery pack to the connector on the control
panel.
8
Reassemble
machine.
NOTE: Charge the batteries before using the machine.
(C)-PAD INSTALLATION
Your local Nil
fi
sk distributor can provide the proper pads and
fl
oor
fi
nishes for
use with this machine.
CAUTION!
Using the wrong kind of pad on this machine can damage
the
fl
oor. The pad must be centered properly on the pad
holder to prevent machine vibration.
For pad installation, follow the steps below (see steps 1 - 6 in Figure
C):
1
Turn the key switch off.
2
Put the machine in the position shown, to access the pad retainer.
3
Go to the front of the machine. While holding the pad retainer with one hand,
rotate the pad and pad driver counter clockwise to loosen the pad retainer.
4
Remove the old pad and install a new one, being careful to center it on
the pad driver.
5
Retighten the pad retainer as tight as possible.
6
Raise the back of the machine to lower the pad housing by lifting as
shown.
(D)-DUST BAG INSTALLATION
Your local Nil
fi
sk distributor can provide the proper pads and
fl
oor
fi
nishes for
use with this machine.
IMPORTANT!
Install dust collector bag (part number 56201569) on top of
control housing (see Figure D). The dust collection system will
not operate properly if the collector bag is full or torn.
(E)-ADJUSTING PAD PRESSURE
The pad pressure is set at the factory for optimal burnishing with most
pad and
fi
nish combinations. If unique pad or
fi
nish conditions require
pad pressure adjustments, adjust by following the procedure below.
NOTE: Pad pressure adjustments should be performed by a quali
fi
ed
service technician.
1
Turn key switch off (O).
2
From underneath burnisher, loosen jam nut (A).
3
To decrease pad pressure , turn bolt (B) clockwise.
4
To increase pad pressure, turn bolt (B) counterclockwise.
5
Re-tighten jam nut (A).
EN
ENGLISH
Summary of Contents for 01610A
Page 6: ...6 FORM NO 71456A UHB 51 1500 EN ENGLISH C D 1 2 3 4 5 6 E A B ...
Page 26: ......
Page 29: ...29 FORM NO 71456A UHB51 1500 08 4 NOTE PAGE ...
Page 30: ...FORM NO 71456A UHB51 1500 08 4 30 ASSEMBLY UHB51 1500 1 4 5 6 7 8 9 10 6 14 12 13 11 6 5 3 2 ...
Page 38: ...FORM NO 71456A UHB51 1500 08 4 38 BODY ASSY 11 01 1 13 3 ...
Page 40: ...FORM NO 71456A UHB51 1500 08 4 40 HEAD ASSY 10 05 ...
Page 44: ...FORM NO 71456A UHB51 1500 08 4 44 LADDER DIAGRAM 08 07 ...
Page 45: ......
Page 46: ......