
Positioning and installation of unit
The arrangement is shown for a unit with a discharge module. If the supplied unit does not have this, step 10 is
ignored.
Step 1
Foundation is placed in the desired place.
Step 2
The vibration dampers (sylomes) are placed under the adjusting
screws.
a. Nilan base
b. Adjusting screws
c. Sylomer
Step 3
Base is adjusted.
a. This section is for the discharge module
and thus is not present where this is not
included in the delivery.
b. Ensure that the base is level.
c. Make a cross measurement so that the
foundation is at an angle.
VPM 600-2200 (English)
BY NILAN
19