4
If existing points are found between Fr and To, a
point list appears.
To highlight a point, press
[^]
or
[v]
. To go to the
stakeout observation screen, press
[ENT]
.
If you have assigned a control job, and
additional points are found in the control job, the
Ctrl
softkey appears under the list.
DivLine S-O
This function divides the line between the instrument and the first target by an input
span number. It then guides you to stake out the points, one by one.
1.
Press
[3]
or select
DivLine S-O
in the Stakeout
menu.
2.
Set up the baseline. To do this, sight the target on
the line (the end point) and press
[MSR1]
or
[MSR2]
.
3.
Enter the total stake number in the Span total
field.
The observation screen for the first stake (from
the instrument) appears.
4.
Sight the prism and press
[MSR1]
or
[MSR2]
.
5.
Use
[^]
or
[v]
to change the guide point. You can
calculate and guide up to double the number of
the stakes.
Summary of Contents for NPL-322
Page 14: ...Contents xiv Total Station NPL 322 Instruction Manual ...
Page 38: ...2 Preparation 24 Total Station NPL 322 Instruction Manual ...
Page 68: ...3 Getting Started 54 Total Station NPL 322 Instruction Manual ...
Page 110: ...4 Applications 96 Total Station NPL 322 Instruction Manual ...
Page 154: ...5 Menu Key 140 Total Station NPL 322 Instruction Manual ...
Page 161: ...Total Station NPL 322 Instruction Manual 147 Checking and Adjustment 6 ...
Page 162: ...6 Checking and Adjustment 148 Total Station NPL 322 Instruction Manual ...
Page 172: ...8 System Diagrams 158 Total Station NPL 322 Instruction Manual ...
Page 188: ...9 Communications 174 Total Station NPL 322 Instruction Manual ...