3
Getting Started
56
Pulse Laser Station NPL-302 Series Instruction Manual
The following examples show how various values are entered:
Jobs
3.3
To record data on the instrument, you must create or open a job.
C
Caution –
Before you use the instrument for the first time, check the job
settings.
Creating a new job
33.1
1.
Press
[MENU]
to open the MENU screen.
2.
Press
[1]
to open the Job Manager.
3.
Press the
Creat
softkey to open the Create
Job screen.
4.
Enter the job name.
To enter ...
Type ...
65' 5 3/8"
[6] [5] [.] [5] [.] [3] [.] [8] [ENT]
65'
[6] [5] [ENT]
65' 5"
[6] [5] [.] [5] [ENT]
65' 5 3/8"
[6] [5] [.] [5] [.] [6] [ENT]
5 3/8"
[0] [.] [5] [.] [3] [.] [8] [ENT]
or
[0] [.] [5] [.] [6]
[ENT]
The numerator and denominator that you enter are automatically converted to the
closest value from the following list: 0, 1/8, 1/4, 3/8, 1/2, 5/8, 3/4, 7/8, 1/16, 3/16,
5/16, 7/16, 9/16, 11/16, 13/16, 15/16.
If the denominator is 16, it is not shown on the screen.
Summary of Contents for NPL-302 Series
Page 4: ......
Page 5: ...Safety 1 In this chapter Q Introduction Q Laser Safety Q Warnings and Cautions ...
Page 12: ...Safety xii Pulse Laser Station NPL 302 Series Instruction Manual ...
Page 28: ...1 Introduction 8 Pulse Laser Station NPL 302 Series Instruction Manual ...
Page 46: ...2 Preparation 26 Pulse Laser Station NPL 302 Series Instruction Manual ...
Page 82: ...3 Getting Started 62 Pulse Laser Station NPL 302 Series Instruction Manual ...
Page 188: ...5 Menu Key 168 Pulse Laser Station NPL 302 Series Instruction Manual ...
Page 196: ...6 Checking and Adjustment 176 Pulse Laser Station NPL 302 Series Instruction Manual ...
Page 208: ...8 System Diagrams 188 Pulse Laser Station NPL 302 Series Instruction Manual ...