Compressor (CM)
Pipe S (suction
gas pipe)
Pipe S (hot gas
pipe)
20
Disconnect the pipes for
suction gas and hotgas.
21
Remove the compressor.
Control board (PWB1)
1 screw
2 straps
1
Remove the screw.
2
Cut off the two straps.
75
Chapter 7 | Component replacement
NIBE AMS10