
2. Secure the drain pipe, as illustrated.
1.
2.
3.
LEK
1.
2.
3.
LEK
1.
2.
3.
LEK
3. Route the heating cable through the condensation
water pipe.
4. Pull the insulation down slightly, connect the hose
to the drain pipe and tighten the hose clamp, as il-
lustrated.
LE
K
1.
2.
3.
5. Lay the heating cable so that the marking is as close
to the drain pipe as possible, as illustrated.
LEK
Drain spout
Marking
6. Connect the cable to the enclosed electrical distribu-
tion box according to section "Connection of the
heating cable" on page 13. (Check the fuse according
to the table, see page 13.)
NOTE
Do not cut the heating cable!
Connection of AG-CH10 to the outdoor unit
AG-AC10
Remove the protective cover according to the instruc-
tions in the outdoor unit's installer manual and connect
AG-CH10 via the outdoor unit's top clamps.
GREY
WHITE
GREEN/YELLOW
AG-CH10
The top clamps in AG-AC10 are connected to 1/2 and N
in the earth circuit breaker as well as PE in terminal block
as illustrated below:
N
L
1
N
N
2/1
1/2
Utomhusenhet
Ellåda
Electrical cabinet
Outdoor unit
F3
Cable routing
The following section describes the recommended cable
routing between the electrical distribution box and the
condensation pipe. Route the heating cable (EB14)
through the lead-in on the underneath. Transition
between electrical cable and heating cable must occur
as illustrated.
AG-CH10 | GB
14