Step 31: Swing Attachment
•
Hang your chosen swings from the swing hooks
Step 32: Concreting structure
•
Using postcrete and following the manufacturer’s instructions, concrete all the posts into
the ground
•
The frame should be left overnight before it is used to ensure the postcrete has dried.