pg. 1
Assembly instructions for Commercial Swing Set
Materials provided
:
4 x 3m square posts
1 x 2.4m or 3m square post pre-drilled for your swings
2 x 1755mm 3”x1½” timbers
2 x Metal Square corner brackets
Your selection of swings
O-hooks
Screws
Page 1: ...tions for Commercial Swing Set Materials provided 4 x 3m square posts 1 x 2 4m or 3m square post pre drilled for your swings 2 x 1755mm 3 x1 timbers 2 x Metal Square corner brackets Your selection of...
Page 2: ...t of simple steps taken to ensure the wood s longevity The timber used on your climbing frame has been pressure treated This essentially means that it has been put into a pressurised vessel and has be...
Page 3: ...Positioning your frame When all five posts have been secured to the brackets you can use the 3 x1 timbers to brace each side of frame together To do this measure 900mm down each post from the bracket...