ABS1376-01/A
39/44
DOMINO - STANDARD ORGANIZER
4.5 Splicing without patching
S
-shaped coiling
1. Install the plastic cable guides (1).
2. Clamp the cable or fanout device on its support using 2 plastic collars (2) and mount them
at the back of the module using the screw provided.
3. Coil the fibres in the cable guides (1).
Cable 1
Cable 2
4. Route the fibres in rings (A) and (B).
5. Perform the splices.
A
B
1
2
Towards plate
Summary of Contents for DOMINO 100
Page 7: ...ABS1376 01 A 7 44 DOMINO STANDARD ORGANIZER V 165 10 1 1 8 13 14 1 2 3 4 5 6 7 9 8 12 ...
Page 8: ...ABS1376 01 A 8 44 DOMINO STANDARD ORGANIZER 12 1 1 14 5 1 2 3 4 6 7 8 9 10 13 8 V 210 ...
Page 13: ...ABS1376 01 A 13 44 DOMINO STANDARD ORGANIZER V 210 1 2 3 3 ...
Page 44: ...ABS1376 01 A 44 44 DOMINO STANDARD ORGANIZER ...